Hiring and Class Size Planner

Attrition never waits for your training plan. Project headcount week by week, size your classes after drop-out, and see the earliest week you actually reach target.

Live · updates as you type

Hiring inputs

One queue or skill at a time.

heads
heads
%
weeks
weeks
%
%
weeks
people
weeks
Total hires needed
42people

Across 4 classes over the next 26 weeks.

Target reached
Week 10

Earliest week productive FTE meets or beats target.

Classes
4
Largest class
20people
Expected graduates
38
Weekly attrition
0.68%
Class schedule
ClassStart weekHiresGraduates after drop-outFully productive week
Class 1Week 32018.0Week 9
Class 2Week 4109.0Week 10
Class 3Week 1165.4Week 17
Class 4Week 1865.4Week 24

Hiring on the day you spot the shortfall is already too late: lead time plus training plus nesting means every hire decided today only counts 8 weeks from now, while attrition keeps removing heads every week in between.

Productive FTE vs target by week

Save or share these results

Take a snapshot of the exact inputs and outputs on screen.

Get the full Excel/VBA version

The full Excel/VBA version with live formulas, RTM tracking, and dashboards is free for now.

Results are estimates for planning purposes only and should not replace professional workforce management judgment.

The planner simulates your team one week at a time. Each week attrition removes a slice of the productive base, classes move through training and nesting, and graduates join the productive pool. Whenever the projection would stay below target, the model books the earliest class that can still help, sized to close the gap after drop-out and capped at your class size limit.

Step by step

  • Weekly attrition = 1 - (1 - annual)^(1/52). Compounding, so 30 percent a year is about 0.68 percent a week, not 30 divided by 52.
  • Pipeline length = lead time + training + nesting. A hire decided in week 1 with a 2 week lead, 4 weeks of training and 2 weeks of nesting is fully productive in week 9.
  • Graduates = class size × (1 - drop-out). A class of 20 with 10 percent drop-out delivers 18 productive agents.
  • Nesting agents count at ramp productivity. At 50 percent, two nesting agents give you one productive FTE.
  • Classes are booked greedily. When the projection falls short, the model starts a class as early as the lead time allows, then repeats until the gap is covered.

Using it well

  • Set the class cap to what your trainers and training rooms can genuinely handle.
  • Be honest about drop-out: use your last few classes, not the best one.
  • Run it monthly and re-check the start weeks as real attrition comes in.
  • Pair it with the Attrition Rate Calculator to set the attrition input, and the Capacity Planning Calculator to set the target headcount.

Frequently asked questions

Why can't I just hire when headcount drops below target?

Because a new hire is not productive on day one. Lead time, training and nesting mean a hire decided today only becomes fully productive weeks later, so the shortfall keeps growing while you wait.

What is class drop-out?

The share of new hires who leave during training or nesting before becoming productive. If 10 percent drop out, a class of 20 only gives you 18 productive agents.

How is weekly attrition calculated?

The annual attrition rate is converted to a weekly rate using the compounding formula 1 - (1 - annual)^(1/52), so a 30 percent annual rate removes about 0.68 percent of heads each week.

What counts as productive FTE during nesting?

Nesting agents handle real contacts but slower than a fully ramped agent. The ramp productivity setting, say 50 percent, counts each nesting agent as half a productive FTE.

Related reading: why a hiring freeze is not a staffing plan and what AI agent assist changes about ramp time.

Download the full Excel model

Get the working spreadsheet behind this page, plus one practical WFM tip a week.

More tools

See all tools